Project start
27 / 10 / 2026
Project duration
36 months
Bed capacity
200 beds
Planned completion
27 / 10 / 2029

About the project

The Maarrat al-Numan Hospital Rehabilitation and Development Project aims to rehabilitate the healthcare facility and develop its infrastructure, supporting better healthcare and the needs of the community.

The approved capacity is 200 beds. The project runs for 36 months from 27 October 2026, with completion planned for 27 October 2029.

Project objectives

Improve access to healthcare
Support a safe care environment
Strengthen hospital readiness
Serve the community over the long term

Project architectural plan

From the approved design
Architectural illustration supplied in the approved design

An architectural illustration from the supplied project material; it does not show the building's current condition. Further plan details will be added after approval for publication.

Main services and departments

  • Emergency

    Emergency care

  • Surgery

    Surgical services

  • Intensive care

    Critical care

  • Outpatient clinics

    Medical consultations

  • Imaging

    Diagnostic imaging

  • Laboratories

    Laboratory testing

Departments shown in the reference design; operational readiness details are being updated.

Project location

Maarrat al-NumanIdlib Governorate · Syria
Coordinates under verification

A hospital location map will be available once its exact coordinates have been verified.

Source: approved project launch information